Campus Environmental Impact Report:List of Tables
- Table 2-1 Summary of Environmental Impacts and Mitigation Measures
- Table 3-1 Summary of Facilities Master Plan Projects
- Table 3-2 Project Description Summary
- Table 3-3 Tentative Project Construction Phasing
- Table 4.1-1 Visual Character of Proposed Project
- Table 4.2-1 State and National Ambient Air Quality Standards and Attainment Status for the South Coast Air Basin
- Table 4.2-2 2006-2008 Ambient Air Quality Data in the Project Vicinity
- Table 4.2-3 Existing Carbon Monoxide Concentrations
- Table 4.2-4 SCAQMD Daily Construction Emissions Thresholds
- Table 4.2-5 SCAQMD Daily Operational Emissions Thresholds
- Table 4.2-6 Daily Construction Emissions - Unmitigated
- Table 4.2-7 Daily Localized Construction Emissions - On-Site Sensitive Receptors
- Table 4.2-8 Daily Regional Operational Emissions
- Table 4.2-9 Daily Localized Operational Emissions
- Table 4.2-10 2009 and 2015 Carbon Monoxide Concentrations
- Table 4.2-11 Annual Greenhouse Gas Emissions
- Table 4.2-12 Annual Greenhouse Gas Emissions
- Table 4.4-1 Land Use Distribution for Monterey Park
- Table 4.4-2 Comparison of the Proposed Project to SCAG Regional Policies
- Table 4.5-1 City of Monterey Park Noise Zone Designation and Limits
- Table 4.5-2 City of Monterey Park Noise Zone Designation and Limits
- Table 4.5-3 Existing Noise Levels
- Table 4.5-4 Existing Community Noise Equivalent Level
- Table 4.5-5 Noise/Land Use Compatibility Chart
- Table 4.5-6 Maximum Noise Levels of Common Construction Machines
- Table 4.5-7 Outdoor Construction Noise Level
- Table 4.5-8 Construction Noise Impacts - Unmitigated
- Table 4.5-9 Vibration Velocities for Construction Equipment
- Table 4.5-10 2015 Estimated Community Noise Equivalent Level
- Table 4.5-11 Construction Noise Impacts - Mitigated
- Table 4.6-1 Level of Service Definitions for Signalized Intersections
- Table 4.6-2 Level of Service Definitions for Unsignalized Intersections
- Table 4.6-3 Existing Intersection Level of Service
- Table 4.6-4 Inventory of Parking Space
- Table 4.6-5 Existing Parking Lot Utilization
- Table 4.6-6 Related Project Trip Generation Estimates
- Table 4.6-7 East Los Angeles College Trip Generation Estimates
- Table 4.6-8 Year 2016 Future Base and Base Plus Project Intersection Level of Service
- Table 4.6-9 Future Campus Parking Demand
- Table 6-1 2009 and 2015 Estimated Community Noise Equivalent Level
Note: The Acrobat Reader software is required to view and print the documents. Please click here to download a free PDF reader if you don't have it on your system.